Meikle River D & Goodfish Compressor Stations

North Central Corridor pipeline

Meikle River D & Goodfish Compressor Stations Project Abstract

The purpose of the project is to meet incremental contracted demand in the Peace River area and ensure 2016 winter requirements are met. The required in-service date for the Project is November 2016. The Project consists of construction of two separate 30 MW turbo compressor packages (gas turbine and compressor). The Meikle River D Compressor Station is located entirely on Crown land and requires the acquisition of 10.53 ha of new land. The Goodfish Compressor Station will require to amend an existing Crown disposition for the new compressor station. Both new sites will include a compressor building, auxiliary buildings and yard piping. GE Oil & Gas will provide the compressor trains consisting of PGT25+1.5 DLE gas turbines and PCL 603 & PCL 802 centrifugal compressors.

Flenco’s presence in the Project

Flenco is pleased to have been selected as preferred partner by GE Oil & Gas to supply its auxiliary systems for this project. For further inquiries about this collaboration, you can ask your usual contact person at our Sales Department or complete and send us our contact form.

Source: https://docs.neb-one.gc.ca

main projects

Get in Touch for information