Combined-cycle power plant – Unit 3
GE (NYSE: GE), in a consortium with China National Machinery and Equipment Import and Export Corporation, has been awarded a US$117 million order from Bangladesh Power Development Board (BPDB) for repowering Unit 3 of the Ghorashal Power Plant, the largest power station in Bangladesh, located in the Narsingdi district. This will be the first repowering project for the country and will provide a much-needed increase in power generation capacity for Bangladesh by adding more than 200 megawatts (MW) of cleaner power to the national grid. The project calls for repowering the existing 210 MW Power Machines (LMZ 200) steam turbine —which is run by a gas-fired boiler—by transforming it into a combined cycle power plant. The repowering will be achieved by installing a gas turbine and a heat recovery steam generator (HRSG) to generate an efficient 416.3 MW in combined cycle mode. As part of the overall repowering scope, the station’s existing steam turbine will be retrofitted with GE’s advanced reaction design steam turbine high pressure (HP) module, intermediate pressure (IP) module and lower pressure (LP) inner module to suit the new steam parameters. GE gained global capabilities to service non-GE supplied equipment through its acquisition of Alstom Power’s thermal services business in November 2015.
Flenco is pleased to have been selected as preferred partner by General Electric (Switzerland) Gmbh to supply its auxiliary systems for this project. For further inquiries about this collaboration, you can ask your usual contact person at our Sales Department or complete and send us our contact form.